Tag: Banneker

Modernized Banneker will be Fabulous!

From the 1920’s through the 1960’s the District of Columbia built extraordinary Jr. High School buildings for 7th, 8th and 9th grade students.  There were two dozen of these large Jr. high buildings.  Each one had all the components of a standard high school including performing arts spaces, choral and instrumental music spaces, art studios, athletic spaces, cafeterias, career/tech and…

Read More »